KCLAD Dewatering Update 11/13/24

The KCLAD Wells weekly update outlines:

Current Production: Two wells are producing a combined 350 gallons per minute, with a water depth of about 86 feet. The flow was reduced to protect pumps located at 105 feet.

Well Inventory: KCLAD has five wells, with the two active ones developed in 2024, and older wells from 1987 and 2023 (#3 and #4 respectively). A shallow pump (Well #4A) will be retired.

Future Development: Plans include putting wells #3 and #4 back into production, adding ultrasonic meters, and investing in a sonic water level meter to monitor subsurface water.

Additional Data: Weekly readings are updated in a provided spreadsheet.